Optimasi Work Instruction Setting Die Mesin AIDA 200 Ton Menggunakan Metode SMED

Velia Sagita Ramadhani(1*), Firda Ainun Nisah(2)

(1) Universitas Singaperbangsa Karawang
(2) Universitas Singaperbangsa Karawang
(*) Corresponding Author

Abstract


PT XYZ is a company engaged in manufacturing automotive components. The company produces and distributes car body parts by performing stamping, welding, assembling, and tooling processes. In the production process, there is a die setting activity as one of the processes that must be passed to produce a part. From the results of observations made on the 200 TON AIDA Press machine die setting activity in accordance with the existing Work Instruction, the average time obtained in the die setting activity is 21 minutes/order. This is one of the shortcomings that creates a 10-minute gap from the target set by the company. So that increasing productivity between workers and machines is needed to achieve these targets. The purpose of this research is to find out, analyze, process, and provide suggestions for improvements to the problem of the long die setting time of the 200 TON AIDA Press machine.  The method used to make improvements is Single Minute Exchange of Dies (SMED). SMED succeeded in reducing die setting time quite significantly with an initial die setting duration of 21.56 minutes to 10.46 minutes, normal time from 24 minutes to 12 minutes, standard time from 32 minutes to 16 minutes, and the percentage reduction obtained was 51.48%.

Keywords


Setting Die; Single Minute Exchange of Dies; Produktivitas

Full Text:

PDF

References


D. L.Purnamawati dan R. Khoirudin, “Penyerapan Tenaga Kerja Sektor Manufaktur di Jawa Tengah 2011-2015,” Riset Ekonomi Pembangunan, vol. 4, no. 1, hlm. 41–52, 2019, [Daring]. Tersedia pada: http://jurnal.untidar.ac.id/index.php/REP

N. A. P.Harahap, F. Al Qadri, D. I. Y. Harahap, M. Situmorang, dan S. Wulandari, “Analisis Perkembangan Industri Manufaktur Indonesia,” Jurnal Kajian Ekonomi & Bisnis Islam, vol. 4, no. 6, hlm. 1444–1450, 2023.

N. Andara, G. M. S. Br Ginting, dan A. Hasibuan, “Strategi Manajemen Operasional Dalam Meningkatkan Efisiensi Produksi di Perusahaan Industri,” Musytari, vol. 5, no. 11, 2024.

E. Fradinata, B. Marsella, dan N. Izzaty, “Pengukuran Produktivitas dengan Menggunakan Metode Objective Matrix pada Proses Produksi UD. Kopi Teungku Aceh,” Serambi Engineering, vol. VII, no. 3, hlm. 3353–3364, Jun 2022.

S. Aziz, C. Nuraini, dan A. Saepudin, “Hubungan Kompetensi dan Motivasi Petani dengan Produktivitas Padi Sawah (Kasus Pada Usahatani Padi Sawah di Desa Sukahurip Kecamatan Pamarican Kabupaten Ciamis),” AGIBUSSINES SYSTEM SCIENTIFIC JOURNAL ISSN:xxxx-xxxx, vol. 1, no. 1, hlm. 9–14, Des 2020.

Suparto dan A. A. Hidayatullah, “Analisa Produktivitas Bagian Steel Pipe Menggunakan Metode Objective Matrix (OMAX) dan KAIZEN (Studi Kasus: Departemen Produksi di PT. Dwi Sumber Arca Waja Batam),” Jurnal Teknik Industri, vol. 25, no. 2, hlm. 25–31, 2022, [Daring]. Tersedia pada: http://univ45sby.ac.id/ejournal/index.php/industri/index

H. H. Azwir, N. C. Wijaya, dan H. Oemar, “Implementasi Metode Single Minute Exchange Of Die Untuk Mengurangi Waktu Persiapan dan Penyesuaian Mold di Industri Polimer,” JISI: Jurnal Integrasi Sistem Industri, vol. 8, no. 2, hlm. 41–52, Agu 2021, doi: 10.24853/jisi.8.2.41-52.

E. Purnomo, A. Rachma Dwicahyani, dan Z. Lillahulhaq, “Analisa dan Perbaikan Waktu Set-up Pergantian Cetakan dengan Metode Single-Minute Exchange of Dies (SMED) (Studi Kasus: PT. XYZ),” Senastitan, vol. 1, hlm. 26–34, Mar 2021.

F. Sumasto dkk., “Peningkatan Value Added dalam Industri Tahu melalui Penerapan Lean Manufacturing dan Analisis Waste,” Jurnal Serambi Engineering, vol. VIII, no. 4, hlm. 7338, 2023.

D. Susanto dan B. I. Putra, “Usulan Perbaikan Proses Changeover Bagian Upper di PT. XYZ Menggunakan Single Minute Exchange of Die (SMED),” Journal of Research and Technology, vol. 10, no. 1, hlm. 45–55, Jun 2024.

M. F. Nurrizky, M. A. Septiana, J. Machmudin, dan M. Syafii, “Peningkatan Efisiensi Mesin CNC Turning Menggunakan Metode Single Minutes Exchange of Dies di PT. X,” Muhamad Syafii Jurnal Ilmiah Teknologi Informasi Terapan, vol. 7, no. 2, 2021.

A. D. Kusumah dan N. Winarsih, “Implementasi Metode Single Minute Exchange of Dies Untuk Optimasi Setting Time Mesin Flexo B1 Grup C Pada Carton Box Departement PT. A,” Industrika, vol. 8, no. 2, hlm. 418–429, 2024, [Daring]. Tersedia pada: https://jurnal.utb.ac.id/index.php/indstrk

B. A. Ashley dan M. Mahachandra, “Penentuan Jumlah Tenaga Kerja Optimal Berdasarkan Waktu Baku Dengan Metode Work Sampling Pada Stasiun Kerja Scouring-Bleaching (Studi Kasus: PT XYZ),” Industrial Engineering Online Journal, vol. 12, no. 4, Okt 2023.

M. Nevenda dan L. M.C. Wulandari, “Analisis Perhitungan Waktu Standart Untuk Menentukan Jumlah Tenaga Kerja Optimal Pada Proses Produksi PT NRZ Prima Gasket,” Jurnal Sains, Teknik, dan Studi Kemasyarakatan, vol. 1, no. 5, hlm. 211–222, 2023, doi: 10.47353/satukata.v1i5.1235.

L. C. Setiawan, “Mereduksi Waktu Setup Menggunakan Metode SMED Pada Mesin ISS Kemas PT Phapros Tbk Semarang,” Industrial Engineering Online Journal, vol. 12, no. 1, 2023.




DOI: http://dx.doi.org/10.30998/string.v10i1.25700

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Velia Sagita Ramadhani

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

 

STRING (Satuan Tulisan Riset dan Inovasi Teknologi) indexed by:



Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.
View My Stats

Flag Counter