ANALISIS GROUND VIBRATION DENGAN METODE PEAK PARTICLE VELOCITY (PPV)

Hari Hadi S(1), Erna Kusuma Wati(2*), Tomas Kristiono(3)

(1) Universitas Nasional
(2) Universitas Nasional
(3) Universitas Nasional
(*) Corresponding Author

Abstract


Measurement of Peak Particle Velocity (PPV) mm / sec in the Sabo dam construction project was carried out using seismic accelerometers. This study is to determine the value of PPV produced by construction equipment and then compared with the BS 6472-2: 2008 standard. The measurement method is carried out based on the applicable rules. PPV measurement results produced by each machine are different. In heavy equipment dump trucks, excavators, and front end loaders show PPV values at distances of 50 m, 100 m, 150 m and 200 m under safe conditions referring to the standard which is still in the range of 0.2 - 0.4 mm / sec. while for the pile driving device, demolition, vibrator pile driver at a distance of 50 meters are in unsafe conditions, because more than the range of 0.2 - 0.4 mm / sec, but at a distance of 100, 150, and 200 m PPV values are at safe condition


Key words: PPV, Ground Vibration, Dam sabo

 



Full Text:

PDF

References


Andhini, N. F. (2017). Analisis getaran tanah (ground vibration) hasil peledakan overburden di site tambang air laya selatan pt. Bukit asam (persero), tbk tanjung enim sumatera selatan. Journal of Chemical Information and Modeling, 53(9), 1689–1699.

Berm, S., Kestabilan, T., Final, L., Pseudo-statik, T. B. M., Simulation, B., Final, O. N., Stability, S., & Method, C. M. P. (2019). Coal Mine Pseudo-Static Method. 3(4).

Citra Kunia putri dan trisna insan Noor, 2011. (2013).. Analisis Pendapatan Dan Tingkat Kesejahteraan Rumah Tangga Petani, 53(9), 1689–1699.

Di, B., Pamapersada, P. T., & Distrik, N. (2015). Dengan Metoda Peak Particle Velocity Beserta. January 2014.

Hidayat, R., Cahyadi, T. A., Winarno, E., Saptono, S., & Koesnaryo, S. (2020). Review : Teknik Artificial Intelligent dalam Prediksi Ground Vibration pada Peledakan. 2020, 187–193.

Nanda Anjaribowo, Dwi Indra Setyawan, S. (2014). Perencanaan Sabo Dam Kali Putih (Km 16,7) Kabupaten Magelang Jawa Tengah. Jurnal Karya Teknik Sipil, 3(4), 956–962.

Newmark, M. S., Zapfe, J. A., & Wood, E. W. (2010). Monitoring construction vibrations at sensitive facilities. 24th National Conference on Noise Control Engineering 2010, Noise-Con 10, Held Jointly with the 159th Meeting of the Acoustical Society of America, 2, 928–933.

Yudiwan, Y., Nugroho, W., & Trides, T. (2016). Analisis Tingkat Getaran Tanah ( Ground Vibration ) Akibat Peledakan Di Pit Kinong , Pt Firman Kataun Perkasa , Kecamatan Melak , Kabupaten Kutai Barat , Kalimantan Timur ( Analysis Ground Vibration Level As A Result Of Blasting At Pit Kinong ,. Jurnal Teknologi Mineral FT UNMUL, 4(1), 47–53.




DOI: http://dx.doi.org/10.30998/faktorexacta.v14i1.7833

Refbacks

  • There are currently no refbacks.




Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

template doaj grammarly tools mendeley crossref SINTA sinta faktor exacta   Garuda Garuda Garuda Garuda Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

Flag Counter

site
stats View Faktor Exacta Stats


pkp index