Pengurangan Pemborosan Waktu Produksi Pada Proses Pembuatan Rumah Boneka Menggunakan Pendekatan Lean
(1) Universitas Indraprasta PGRI
(*) Corresponding Author
Abstract
Keywords: Lean Manufacturing, Waste, Value Stream Mapping, Lead Time, Fshbone Diagram, CV. Rumah boneka.
Full Text:
PDFReferences
Gasperz, V & Fontana, A. (2011). Lean Six Sigma for Manufacturing and Service Industries. Bogor: Penerbit Vinchristo Publication.
Halim, A.H.(2003). TI-3122 perencanaan dan pengendalian Produksi: Keseimbangan Lintasan. Institut Teknologi Bandung. Retrieved from http://Istipb.org
Heizer, J. & Render, B. (2009). Manajemen Operasi, Edisi 7. Jakarta: Salemba Empat
King, P. L. (2009). Lean for the Process Industries: Dealing with Complexity. CRC Press. Taylor & Francis Group.
Nielsen, A. (2008). Getting Started with Value Stream Mapping. Salt Spring Island: Gardiner Nielsen Associates Inc.
DOI: http://dx.doi.org/10.30998/faktorexacta.v11i3.2685
Refbacks
- There are currently no refbacks.
![Creative Commons License](http://i.creativecommons.org/l/by-nc/4.0/88x31.png)
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
![DOAJ](https://i.imgur.com/iNSkAM1.png)
![Garuda](https://garuda.kemdikbud.go.id/assets/img/garuda1.png)
![ISSN BRIN](https://upload.wikimedia.org/wikipedia/commons/d/dd/Alt_Logo_BRIN.png)
![sinta](https://sinta.kemdikbud.go.id/public/assets/img/brand_sinta.png)
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
![pkp index](https://i.imgur.com/gkFSqQh.png)