Perencanaan Jadwal Induk Produksi Komponen Band Komp Battery di PT. Mada Wikri Tunggal

Aldi Raihan Rusnadi(1*), Dene Herwanto(2)

(1) Universitas Singaperbangsa Karawang
(2) Universitas Singaperbangsa Karawang
(*) Corresponding Author

Abstract


PT. Mada Wikri Tunggal is a company engaged in the automotive industry which produces small components in motor parts. A common problem experienced by each production company is the planning for the amount of production that must be in accordance with the production capacity coupled with fluctuating demand. So that companies can make orders according to capacity and also the time required for a Master Production Schedule. The method used is the changing labor method. Because this method is very suitable for companies that experience fluctuating demand. The results obtained are that the company can meet the existing demand for the period January to December 2021 as many as 48507 units. The Regular Time fare in 12 periods / 1 year is Rp. 242,685,000. The Hiring fee in 1 year is Rp. 16,000,000. The Lay Off fee in 1 year is Rp. 20,000,000. And the cost of Under Time for 1 year is Rp. 1,750,000. So the total production cost of PT. Mada Wikri Tunggal of Rp. 280,435,000.


Keywords


Master Production Schedule; Change labor method; Total cost of production

Full Text:

PDF

References


A. Rasbina, S. Sinulingga, and I. Siregar, “Perencanaan Jadwal Induk Produksi Pada PT. XYZ,” E-Jurnal Tek. Ind. FT USU, vol. 2, pp. 54–57, 2013.

V. Gasperz, Production Planning And Inventory Control Berdasarkan Pendekatan Sistem Terintegrasi MRP II dan JIT Menuju Manufakturing 21. Jakarta: PT. Gramedia Pustaka Utama, 2005.

J. E. Biegel, “Production Control: A Quantitative Approach,” 1980.

A. Siregar, “Penyusunan Jadwal Induk Produksi Pada PT. Hitachi Construction Machinery Indonesia,” 2012.

A. Z. Taqwa, “Analisis Kapasitas Produksi Pemecah Batu Stonr Crhusher Dengan Metode Capacity Requirement Planning (CRP),” J. Tek. Mesin, 2016.

N. A. Nanih Suhartini and T. Mulyanto, “Implementasi Metode Cut And Fit Pada Penentuan Jadwal Induk Produksi Produk NSH,” J. Ilm. Teknol. dan Rekayasa, vol. 25, 2020.

Y. Nasution, A. H., dan Prasetyawan, Perencanaan & Pengendalian Produksi, Pertama. Yogyakarta: Graha Ilmu, 2008.

A. H. Nasution, Perencanaan dan Pengendalian Produksi, Pertama. Surabaya: Guna Widya, 2003.

Fajrian Nur Adnan, “Optimasi Analisis Peramalan dengan Metode Regresi Weighted Moving Average,” J. Inf. Syst., vol. 4, pp. 119–128, 2019.

R. Supriyadi, “Penjadwalan Produksi LKS-Filler Pada Proses Ground Calcium Carbonate Menggunakan Metode MPS di Perusahaan Kertas,” SINERGI, vol. 20, pp. 157–164, 2016.




DOI: http://dx.doi.org/10.30998/string.v5i3.8615

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Aldi Raihan Rusnadi

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

 

STRING (Satuan Tulisan Riset dan Inovasi Teknologi) indexed by:



Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.
View My Stats

Flag Counter