Analisis Perencanaan Kebutuhan Material Proyek dengan Metode Material Requirement Planning
(1) Universitas Indraprasta PGRI
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Y. Sopiah and D. Pramono, “Analisis Perbandingan Penyediaan Bahan Material Struktur Lantai 2 dengan Metode Material Requirement Planning (MRP) (Studi Kasus: Proyek Gedung Guest House V Hotel),” in Proceeding PESAT, 2013, vol. 5.
G. Wibisono, S. Rahayuningsih, and H. B. Santoso, “Analisis Penerapan MRP Terhadap Perencanaan Dan Pengendalian Persediaan Bahan Baku Pada PT . Latif Di Kediri,” JATI UNIK, vol. 1, no. 1, pp. 40–46, 2017.
T. Y. T. Kusuma, “Analisis Materila Requirement Palnning (MRP) di C-Maxi Alloycast,” Integrated Lab Journal, vol. 5, no. 2, pp. 81–94, 2017.
Suparno, “Analisis penerapan material requirement planning (MRP) dengan mempertimbangkan lot sizing,” Nusantara Journal of Computers and Its Aplications., vol. 2, no. 2, pp. 71–81, 2017.
T. Wahyuni and A. Wardhono, “Analisis Persediaan Material pada Pembangunan Proyek My Tower Hotel & Apartment dengan Menggunakan Metode Material Requirement Planning (MRP),” Rekayasa Tek. Sipil, vol. 1, no. 1, pp. 71–85, 2017.
DOI: http://dx.doi.org/10.30998/string.v3i3.3601
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Yuni Wibawanti
This work is licensed under a Creative Commons Attribution 4.0 International License.
STRING (Satuan Tulisan Riset dan Inovasi Teknologi) indexed by:
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.
View My Stats