Perencanaan Pengadaan Bahan Baku Karoseri Menggunakan Metode Material Requirements Planning
(1) Universitas Singaperbangsa Karawang
(2) Universitas Singaperbangsa Karawang
(*) Corresponding Author
Abstract
One part of the company's operational process is a production process, which is is the core activity of a manufacturing company. In the production process, a company takes a resource in the form of raw materials to be processed into products. The problems that often occur are a shortage and excess of raw material inventory. The company is required to be able to solve these problems so that the production process runs effectively and efficiently. Therefore, it is necessary for the company to have a method of planning and controlling raw material inventory to determine the right time for ordering and minimizing inventory costs. The method used is the forecasting method with linear regression analysis and material requirements planning with lot-sizing techniques: lot for lot, economic order quantity, and period order quantity. The results show that the average product demand forecast per month is 85 units. Then, the lot-sizing techniques that produce the lowest cost are the lot for lot technique and the period order quantity with a total cost of Rp. 11,524,753.
Keywords
Full Text:
PDFReferences
M. Zainul, Buku Manajemen Operasional. Sleman: Deepublish, 2019.
H. Pradiko, “Analisa Pemilihan Metode MRP untuk Pengendalian Persediaan Bahan Baku pada PT. X,” Universitas Mercu Buana Jakarta, 2018.
D. H. D. Purnama and F. Pulansari, “Perencanaan dan Pengendalian Bahan Baku Produksi Kerupuk dengan Metode MRP Untuk Meminimumkan Biaya Persediaan Bahan Baku di UD. XYZ,” Juminten J. Manaj. Ind. dan Teknol., vol. 4, pp. 49–57, 2020.
A. Susmita and B. J. Cahyana, “Pemilihan Metode Permintaan dan Perencanaan Kebutuhan Bahan Baku dengan Metode MRP di PT. XYZ,” Semin. Nas. Sains dan Teknol. 2018, pp. 1–11, 2018.
T. Ernita, R. Ervil, and R. Meidy, “Perencanaan Persediaan Bahan Baku dengan Metode Material Requirement Planning (MRP) pada Proses Produksi Bak Mobil Truk di CV. Lursa Abadi Kota Padang,” J. Sains dan Teknol. J. Keilmuan dan Apl. Teknol. Ind., vol. 21, no. 1, p. 40, 2021.
Y. Agustrimah, A. Sukarsono, and S. Sukarni, “Perencanaan Kebutuhan Bahan Baku dengan Metode Material Requirement Planning (MRP) pada Proses Produksi Jas Almamater di Home Industry Kun Tailor Tulungagung,” Tek. J. Sains dan Teknol., vol. 16, no. 1, p. 53, 2020.
H. Febriani, I. Pratiwi, and W. Andalia, “Analisis Perencanaan Persediaan Bahan Baku dengan Menggunakan Metode Material Requirement Planning (Studi kasus pada UMKM Keripik Usus Cabe Babe),” Ind. Inov. - J. Tek. Ind. ITN Malang, 2022.
H. M. Darmayanti, T. Hernawati, and B. Harahap, “Perencanaan Kebutuhan Bahan Baku Produk Kue Bawang Abon Menggunakan Metode MRP ( Material Requirement Planning ),” Bul. Utama Tek., vol. 17, no. 3, pp. 286–290, 2022.
G. Wibisono, S. Rahayuningsih, and H. B. Santoso, “Analisis Penerapan MRP Terhadap Perencanaan dan Pengendalian Persediaan Bahan Baku pada PT. Latif di Kediri,” JATI UNIK, vol. 1, no. 1, pp. 40–46, 2017.
M. R. Lizamza, “Analisis Perencanaan Persediaan Bahan Baku Batu Bata dengan Metode Material Requirement Planning (MRP) ( Studi Kasus UKM Batu Bata Wisnu Dasjak),” Universitas Muhammadiyah Palembang, 2019.
M. D. B. Penindra, D. M. K. Muku, and H. Sentosa, Penerapan Material Requirements Planning dalam Pengendalian Persediaan Bahan Baku Carded Fiber pada PT. Hilon Indonesia-Bali. Bali: Universitas Udayana, 2011.
DOI: http://dx.doi.org/10.30998/string.v8i1.16330
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 Fitriana Fitriana, Winarno Winarno
This work is licensed under a Creative Commons Attribution 4.0 International License.
STRING (Satuan Tulisan Riset dan Inovasi Teknologi) indexed by:
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.
View My Stats