Implementasi Lean Manufacturing untuk Mengurangi Waste pada Produksi Pivot Piece (Studi Kasus PT. Tri Jaya Teknik Karawang)

Muthia Elsa Farida(1*), Fahriza Nurul Azizah(2), Hamdani Hamdani(3)

(1) Universitas Singaperbangsa Karawang
(2) Universitas Singaperbangsa Karawang
(3) Universitas Singaperbangsa Karawang
(*) Corresponding Author

Abstract


PT Tri Jaya Teknik Karawang is one of the manufacturing companies engaged in the production of vehicle parts, because its main product is pivot piece. As for other forms of products produced by this company, such as Gongsol and Fuji Seat. This product research at PT Tri Jaya Teknik Karawang will be carried out on one type of Piece Pivot product, because this product is the company's main product, whose regular demand every month is always there and the amount is uncertain. This company has waste in the production line, namely the existence of product defects and lead times. This study aims to determine the types of waste and what factors occur in the production of pivot pieces at PT. Tri Jaya Engineering Karawang. By using the Lean Manufacturing method which begins with creating a Value Stream Mapping (VSM) then performs an analysis using the Failure Mode and Effects Analysis (FMEA) method. It is known that in the production of pivot pieces there are 3 types of waste identified, namely waiting time, unnecessary waste of inventory, and product defects. Proposed improvements to minimize waste in the production of pivot pieces are to carry out regular machine maintenance, create a production flow and provide warnings and evaluations of the performance of production operators.


Keywords


Lean Manufacturing; Waste; Production; Value Stream Mapping; Pivot Piece

Full Text:

PDF

References


A. M. Dinda, F. Teknik, and U. Telkom, “Perancangan Perbaikan Area Permesinan Komponen Isolating Cock Di Pt Pindad ( Persero ) Untuk Meminimasi Waste Menggunakan Metode 5S Dengan Pendekatan Lean Manufacturing Design Improvement Machining Area Components Isolating Cock in Pt Pindad ( Persero ) T,” e-Proceeding Eng., vol. 2, no. 2, pp. 4976–4983, 2015.

B. M. Musfita and N. A. Mahbubah, “Implementasi Lean Manufacturing Guna Meminimalisasi Pemborosan Pada Proses Produksi AMDK Jenis Gelas Pada PT.XYZ,” J. Serambi Eng., vol. 6, no. 2, pp. 1683–1693, 2021, doi: 10.32672/jse.v6i2.2864.

I. Setiawan and A. Rahman, “Penerapan Lean Manufacturing Untuk Meminimalkan Waste Dengan Menggunakan Metode VSM Dan WAM Pada PT XYZ,” Semin. Nas. Penelit. LPPM UMJ, pp. 1–10, 2021, [Online]. Available: http://jurnal.umj.ac.id/index.php/semnaslit.

V. Gaspersz, “Pusdiklat Lean Six Sigma Untuk Menciptakan Manusia Lean Six Sigma Dalam Mengelola Industri 4.0 Dan Society 5.0,” 2019, pp. 1–90.

A. P. Pradana, M. Chaeron, and M. S. A. Khanan, “Implementasi Konsep Lean Manufacturing Guna Mengurangi Pemborosan Di Lantai Produksi,” Opsi, vol. 11, no. 1, p. 14, 2018, doi: 10.31315/opsi.v11i1.2196.

T. Ristyowati, A. Muhsin, and P. P. Nurani, “MINIMASI WASTE PADA AKTIVITAS PROSES PRODUKSI DENGAN KONSEP LEAN MANUFACTURING (Studi Kasus di PT. Sport Glove Indonesia),” Opsi, vol. 10, no. 1, p. 85, 2017, doi: 10.31315/opsi.v10i1.2191.

M. Osterling and K. Martin, Praise for Value Stream Mapping. California: McGraw Hill Professional, 2014.

N. Permana and V. Pujani, “Penerapan Lean Manufacturing Untuk Mengurangi Waste Pada Proses Produksi (Tiang Post) Produk Guardrail Di Pt. Xxx,” Jimat, vol. 10, no. November, pp. 81–99, 2019.

F. Fatullah, “Analisa Risiko Kecelakaan Kerja dengan menggunakan Metode FMEA (Failure Mode and Effect Analysis) (Studi Kasus: Proyek ORF (Onshore Receiving Facility) Bukit Tua Di PT. Raga Perkasa Ekaguna, Madura Tahun 2018),” J. TechLINK, vol. 4, no. 1, pp. 19–29, 2020.

I. Masrofah and H. Firdaus, “Analisis Cacat Produk Baju Muslim Di Pd. Yarico Collection Menggunakan Metode Failure Mode And Effect Analysis,” J. Media Tek. dan Sist. Ind., vol. 2, no. 2, p. 43, 2018, doi: 10.35194/jmtsi.v2i2.404.

K. Lestari and D. Susandi, “Penerapan Lean Manufacturing untuk mengidentifikasi waste pada proses produksi kain knitting di lantai produksi PT. XYZ,” Pros. Ind. Res. Work. Natl. Semin., vol. 10, no. 1, pp. 567–575, 2019.




DOI: http://dx.doi.org/10.30998/string.v6i3.11118

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Muthia Elsa Farida, Fahriza Nurul Azizah, Hamdani Hamdani

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

 

STRING (Satuan Tulisan Riset dan Inovasi Teknologi) indexed by:



Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.
View My Stats

Flag Counter