Analisis Metode 5S Pada Stasiun Kerja Pembuatan Rumah Boneka

Tiara Tiara(1), Surya Perdana(2*), Atikah Atikah(3)

(1) Universitas Indraprasta PGRI
(2) Universitas Indraprasta PGRI
(3) Universitas Indraprasta PGRI
(*) Corresponding Author

Abstract


On the production floor CV. There are 6 work stations that produce wooden dollhouses. All activities carried out by workers are carried out simply with irregular production floors where workers put the tools and materials used out of place which causes the workspace to be more narrow and work risks arise. To correct this, an analysis of the work environment will be carried out using 5S. The formulation of the problem is done through observations made on the production floor CV. RB. The review is carried out on the current work environment layout and the problems that occur in it. The identification results are used as a basis for compiling the concept of applying 5S in accordance with the characteristics of the production floor CV. RB. Analysis of the impact caused by the existing conditions is the result of observations and interviews with relevant parties. Furthermore, this research will give a proposal to solve the problems in the production of dollhouses using 5S. One of the improvements made is the provision of training on the basic concepts of 5S. By using 5S there will be improvements where workers will become disciplined, reduce waste and work risks.

Full Text:

PDF

References


Farihah, T., & Krisdiyanto, D. (2018). Penerapan 5S (Seiri, Seiso, Seiton, Sheiketsu, Shitsuke) pada UKM Olahan Makanan di Dusun Sempu, Desa Wonokerto. Jurnal Bakti Saintek, 2(2), 43–49.

Hudori, M. (2017). Penerapan Prinsip 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) di Gudang Zat Kimia Perusahaan Perkebunan Kelapa Sawit. Industrial Engineering Journal, 6(2), 45–52.

Kartika, H., & Hastuti, T. (2011). Analisa Pengaruh Sikap Kerja 5S dan Faktor Penghambat Penerapan 5S Terhadap Efektivitas Kerja Departemen Produksi Di Perusahaan Sepatu. Jurnal Ilmiah PASTI, 5(1), 47–54.

Nugraha, A. S., Desrianty, A., & Irianti, L. (2015). Usulan Perbaikan Berdasarkan Metode 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) Untuk Area Kerja Lantai Produksi Di PT.X. Reka Integra, 3(4), 219–229.

Prastiyah, A. (2014). Efektivitas Implementasi Program 5s (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) Di PT PJB UP Gresik. Jurnal Manajerial, 1(1), 72–79.

Tanuwijaya, A., & Purwanggono, B. (2015). Penerapan Metode 5S dan Perancangan Fasilitas Peletakkan Material dan Peralatan Guna Eliminasi Waste Of Motion Dalam Perakitan Generator Set (Studi Kasus PT. Berkat Manunggal Jaya). Industrial Engineering Online Journal, 4(1), 1–7.

Wahyudi. (2017). Penerapan Budaya Kerja 5S dan Pengaruhnya Terhadap Kinerja Karyawan. Teknoterap, 1(1), 49–71.

Widianti, T., Damayanti, S., & Sumaedi, S. (2015). Implementasi 5S Untuk Optimasi Keselamatan, Kesehatan dan Performa Kerja. Prosiding Seminar Nasional Teknologi Pengelolaan Limbah XIII, Pusat Teknologi Limbah Radioaktif-BATAN, 315–324. www.batan.go.id/seminarlimbah




DOI: http://dx.doi.org/10.30998/faktorexacta.v13i3.5912

Refbacks

  • There are currently no refbacks.




Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

template doaj grammarly tools mendeley crossref SINTA sinta faktor exacta   Garuda Garuda Garuda Garuda Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

Flag Counter

site
stats View Faktor Exacta Stats


pkp index